EDUCATION

Royal Roads University, Colwood

Celerity has worked on numerous buildings for Royal Roads University, providing Building Code consulting as well as Independent Professional (IP) services as the campus is located on federal lands and as such is not subject to a local jurisdiction’s building permit process. In lieu, the University regularly trusts Celerity to review designs for compliance with the BC Building Code, approve plans for Building Permit, and recommend the final buildings for occupancy. Some of the many buildings consulted on include the Sherman Jen Building (renovations and an addition to the heritage building), Learning and Teaching Auditorium (renovations and a change of use from Group A-3 to A-2), Grant Building IT Labs (review for modernization of IT services), and the Recreation Centre (addition incorporating new main entrance and additional change, storage and service rooms).

Brentwood College, Mill Bay

Brentwood College is a university prep boarding school located on the coast of Vancouver Island. Celerity was retained to provide a building code review for their new Academic Building, along with several Alternative Solutions which have allowed the client to retain some beautiful design features, such as an interconnected floor space, combustible content in the atrium, combustible heavy timber construction, exit exposure protection and sprinkler protected glazing, as well as an Engineering Judgement for draft stops. Reviews were completed at the Schematic Design, Design Development and Construction Document stages. Celerity also provided a minor variance for an interconnection between storeys for the Woodward Building.

Pexsisen and Centre Mountain Lellum Elementary and Middle Schools, 3100 Constellation Avenue, Langford

Celerity provided Building Code consulting for the two new educational facilities, preparing code reports, alternative solutions, and providing interpretations and support to the project architect.  The project consisted of one 3 storey middle school building and one 2 storey elementary school building. The elementary school also contains a separate suite for a daycare facility.

SFU Harbour Centre Campus, 515 / 555 West Hastings Street, Vancouver

This project involved renovations to the 555 Harbour Centre building to accommodate interconnection at the 3rd floor with the adjacent 515 Spencer Building to expand their operations. This was achieved by opening the demising wall which separated the two floor areas. Celerity provided a Code review, including Part 11 upgrades, and a report for the proposed renovations.

Emily Carr University, Great Northern Way Campus, Vancouver

Celerity provided a Building Code review for renovations to Units 140, 170, and 180, which required a change in major occupancy from their current uses to that of Group A, Division 2 (assembly), resulting in upgrades to the existing building. Review of applicable Part 11 upgrade triggers was performed, and support provided in the form of negotiations with the City of Vancouver regarding seismic upgrade requirements.

UBC Earth Sciences Building Room Renovation

This project included a feasibility study for conversion of a basement room to a computer-based digital testing facility (CBTF), that includes egress review, occupant load, washroom facilities, and wall/floor assemblies. Celerity provided a Code review and design review memorandum documenting our findings.

UBC Koerner Library, Vancouver

Celerity provided an occupant load and exit capacity review for the library on the first floor.

Vancouver General Hospital (VGH) Jack Bell Research Centre, Vancouver

Celerity provided Part 3 and Part 11 related Building Bylaw consulting services for this project, which involved the creation of an Advanced Testing and Imaging Centre within the Jack Bell Research Centre to facilitate cardiovascular research and teaching labs.

Delta Christian School, 4789 53rd St, Delta

Review proposed design for fire and life safety codes compliance for alterations and additions to the existing school building, and the construction of a new building.

William Watson Elementary School, 16450 80 Avenue, Surrey

Building code review and report for an 875m2, 2-storey horizontal addition to the existing school building.

Marie Curie Elementary School, 5811 184 Street, Surrey

Building code review and report for a 796m2 single storey horizontal addition to the existing school building.

Shawnigan Lake School, 1975 Renfrew Rd, Shawnigan Lake

Building code review of a 2 storey and basement dormitory residence, with attic storage and staff living quarters, at the Construction Documentation stage; and an Alternative Solution for exit exposure.

Camosun College, 3100 Foul Bay Rd, Victoria

·         Paul Building

Review the compliance of the existing standpipe and hose stations within the Paul Building.

·         Ewing Building

Review fire and life safety compliance, consulting for new elevator installation.

·         Lansdowne Campus

Review the existing buildings with respect to egress and confirm adequate and safety egress was provided independently of access to a pedestrian bridge.

Burnaby Montessori, 5849 Kingsway

A Code review and negotiation with the City of Burnaby were required for this project, which involved renovations/expansion to the existing daycare facility on site.