AIRPORT AND PORT

Nanaimo Airport Terminal Expansion – Independent Professional

Celerity Engineering reviewed the building permit drawings and documents for compliance with the relevant building and fire codes and recommended that the Nanaimo Airport Commission issue approval to construct.  Construction completed and the new terminal opened to passengers in early 2020. https://www.nanaimoairport.com/business/airport-improvements/

Annacis Auto Terminal – Warehouse Upgrade, 100 – 820 Dock Road, Delta

As IP, our role was to review permit documents for compliance with the 2020 National Building Code for a warehouse upgrade for the Auto Terminal that included floor replacement, a new pallet racking system, installation of a new fire suppression system that includes a fire pump and backup generator, and upgrades to lighting and electrical rooms.

Seaspan Pier – Outfit Pier, 50 Pemberton Avenue, North Vancouver, BC

In the role of IP, Celerity Engineering will review the building permit drawings for compliance with the 2020 National Building Code, for the construction of amenities buildings for staff to use on an outfit pier at the Vancouver shipyards.  The buildings will be temporary, to allow them to be relocated to different areas of the outfit pier, depending on the size of ship being built.

Westshore Terminals

Celerity is the Code Consultant for the new large industrial facility for processing incoming and outgoing Potash in Delta, BC.  The facility includes a wash bay building, multiple transfer towers and an outbound sampling tower, a railcar dumper building, dumper pit tunnel, potash off-spec building, and a potash storage building.  This project is underway with project deliverables reviewed by the Port of Vancouver and their IP assigned to the project.

Seaspan modular office

Proposed South Jetty Building - Victoria Shipyards

Review for feasibility study of proposed new South Jetty Building. The building as anticipated to be a three-storey structure. The main floor will be a combination of workshops and storerooms. A portion of the main floor will be the full height of the building. The second and third floors will encompass offices, workstations, meeting spaces, meal area, locker rooms, washrooms, electrical and data room, and storage rooms. An elevator to these floors will be provided. An industrial elevator will provide access to storage rooms on the 2nd floor. Mechanical and electrical rooms will ideally be on the 2nd floor to maximize the footprint of the main floor for production space.